Commercial Review & Estimates

Cost checking, estimating and commercial assurance across the whole scheme, from pre-tender budget to tender review and delivery.

What Arete does

Arete provides construction estimating and commercial assurance for public sector highway and infrastructure schemes, from the earliest budget setting through tender review and into delivery. The work is client-side, independent and grounded in real local market data.

The service is used by two kinds of client: the council PM who needs to know that a scheme is fundable and priced sensibly before it goes out to tender, and the framework contractor or delivery partner who needs a sanity check on their own numbers before submitting a price.

The two client cases

Client-side cost assurance

For a council or public body promoting a scheme, Arete provides pre-tender estimates, cost model development, cost checking and tender return analysis. The output supports business case approvals, gateway reviews and the pre-tender authorisation decisions the client needs to move confidently through their own governance.

Contractor-side estimating support

For a framework contractor pricing a public sector scheme, Arete offers independent price benchmarking, take-off support, and second-pair-of-eyes review of the tender before submission. The work is confidential to the contractor and helps avoid the twin risks of pricing too low to be sustainable or too high to win.

Method and sources

Estimates and reviews use a defensible methodology so the numbers stand up to scrutiny at gateway reviews, member briefings and public accounts scrutiny.

  • First-principles measurement from the drawings and specifications
  • Benchmark rates from comparable local schemes, recent tender returns and published sources
  • Market check with statutory undertakers and specialist subcontractors for high-value elements
  • Risk allowance and contingency built on an explicit risk register, not a percentage assumption
  • Clear separation between base cost, risk and inflation

What you get

Every engagement produces the same set of tangible deliverables so the client always has a clear record of what was reviewed, agreed and reported.

  • Bill of quantities or priced take-off
  • Estimate summary at the accuracy level the stage requires
  • Cost model with clear base cost, risk and inflation breakdown
  • Tender return comparison and exception report
  • Written recommendation on award or on next steps

When to bring us in

The value of this service compounds the earlier you appoint. As a rule, get in touch if any of the following apply:

  • A scheme needs a pre-tender estimate to support a business case or gateway approval
  • You have tender returns back and need an independent view on whether they are realistic
  • A design change is being priced and you want to check the contractor's figure
  • You are entering an ECI second stage and need to convert the developed design into a price
  • A contractor wants an independent sense-check on a public sector bid before submission

Sector focus

Arete works almost exclusively with local authorities and public bodies on highways and infrastructure schemes across Cambridgeshire and the East of England. That focus means every recommendation is calibrated to the standards, procurement routes and reporting cadences public sector clients need.

Frequently asked questions

What is a pre-tender estimate?

A pre-tender estimate is the client-side view of what a scheme should cost, produced before the works are put out to tender. It sets the budget expectation for the client, informs the funding case, and gives a yardstick against which tender returns can be assessed.

What is the difference between an estimate and a QS take-off?

A take-off is the measurement of quantities from the drawings. An estimate applies rates to those quantities to arrive at a cost. The two are related, and Arete provides both, but they answer different questions and are produced at different levels of accuracy at different stages.

How accurate is an estimate at design stage 3?

At Stage 3 an estimate is typically produced at plus or minus fifteen to twenty per cent, depending on how much of the design has been fixed. Arete makes the accuracy level explicit in every report so it is not read as a certain price.

Where do the benchmark rates come from?

From comparable local schemes, recent tender returns Arete has seen, published sources such as SPON's, and market checks with subcontractors and statutory undertakers on high-value elements. The sources for every rate are recorded so the estimate can be defended if questioned.

Can you provide a fixed-fee cost consultancy service on a whole scheme?

Yes. On schemes with a clear scope Arete offers fixed-fee estimating and commercial assurance from pre-tender through to final account. On less-defined schemes we agree a scope for each stage and price accordingly.

Need a defensible number before the scheme goes out?

An independent pre-tender estimate is one of the highest-return spends on a public sector scheme. Talk to us before the scheme goes to market.

Start a conversation