Design Review

Independent buildability, value and risk review of scheme designs before work begins, so problems get caught on paper rather than on site.

Which kind of design review this is

"Design review" means two different things in the built environment. One is the planning and architectural review carried out by design panels to judge the quality and appearance of a proposal. That is important, and it is not what Arete does.

Arete does the other kind: an independent, buildability-led technical review of a scheme design, focused on whether it can actually be built safely, on time and on budget. On a highways or infrastructure scheme that means reading the drawings and specifications through the eyes of the site team, the statutory undertakers, and the eventual maintainer.

When Arete's design review adds most value

The review is most valuable while the design still has room to change. On a RIBA staged project that is typically late Stage 3 or early Stage 4. On an NEC infrastructure scheme it maps to the pre-construction period, before the design is issued for tender or for construction.

A late review can still save money on variations and rework, but the earlier the design is looked at, the more it can shape the outcome.

What we review

The review is deliberately broad. On a highways scheme Arete looks at buildability, value engineering opportunities, technical risk, interface with existing infrastructure, and the practicality of the construction sequence itself.

  • Buildability of details, junctions and connections
  • Practicality of the proposed construction sequence and temporary works
  • Value engineering options that would reduce cost or programme without changing the scheme outcome
  • Health and safety risk in construction, use and maintenance
  • Interfaces with buried services, adjacent structures and existing carriageway
  • Consistency between drawings, specifications, bills of quantities and design assumptions
  • Compliance with the client's standards and framework requirements

The deliverable

The review is documented as a written report with a clear finding against each item, plus marked-up drawings where a picture communicates faster than words. Where useful, Arete sits with the design team to walk through the findings and agree the changes that will be adopted.

What you get

Every engagement produces the same set of tangible deliverables so the client always has a clear record of what was reviewed, agreed and reported.

  • Written design review report with prioritised findings
  • Marked-up drawings against the key buildability comments
  • Value engineering options with indicative cost and programme impact
  • Risk register additions where the review has identified new risks
  • Meeting with the design team to close out the findings

When to bring us in

The value of this service compounds the earlier you appoint. As a rule, get in touch if any of the following apply:

  • The design is nearing tender issue and has not yet had an independent buildability check
  • The scheme is complex, phased or has to be built in a live operating environment
  • The design has been developed by a single discipline and would benefit from a wider set of eyes
  • You are entering an ECI second stage and want to lock in value engineering before pricing
  • Previous schemes with the same designer have thrown up avoidable variations on site

Sector focus

Arete works almost exclusively with local authorities and public bodies on highways and infrastructure schemes across Cambridgeshire and the East of England. That focus means every recommendation is calibrated to the standards, procurement routes and reporting cadences public sector clients need.

Frequently asked questions

What is the difference between design review and a planning design review?

A planning design review is carried out by an appointed panel to judge design quality and fit with local plan policy. Arete's design review is a technical, buildability-led review of the scheme itself: whether it can be built as drawn, at the cost and programme claimed, without unnecessary risk. The two run in different processes and answer different questions.

How is design review different from CDM Principal Designer?

The Principal Designer under CDM holds a specific legal role around health and safety in design. Arete's design review is broader in scope, taking in buildability, value engineering, technical risk and constructability. It complements the Principal Designer role rather than replacing it.

When in the RIBA stages does design review happen?

Most effectively at late Stage 3 or early Stage 4, when the design has enough detail to review meaningfully but is still open to change. A review at Stage 5 can still add value in catching remaining issues before construction, but its influence on the design is more limited.

Do you review the whole design or just the parts we are worried about?

Either. Arete can carry out a full multidisciplinary design review, or focus on a specific element such as drainage, structures, temporary works or the interface with existing services. The scope is agreed with the client at the start.

Will you sit with the designer to agree changes?

Yes. The review is delivered as a written report and a meeting or workshop with the design team, so recommendations are understood, discussed and either adopted or formally answered.