Independent commercial, technical and programme review of construction contracts to protect the client's position before the ink dries.

What Arete reviews, and what we do not

Arete provides a commercial and technical contract review, not a legal opinion. That distinction matters. A solicitor tells you whether a clause is enforceable; Arete tells you whether it will work on your scheme, whether the price and programme it implies are realistic, and where the commercial and technical risk actually lands.

On a public sector highway or infrastructure scheme those two questions rarely have the same answer. A contract can be perfectly enforceable and still commercially unbalanced. Arete's job is to make the commercial and technical balance clear before the contract is signed.

Contract forms we work with

Arete regularly reviews the standard forms used by councils, public bodies and their contractors on highways and infrastructure work.

  • NEC3 and NEC4 in all common Options (A, C, E)
  • JCT design and build, standard building contract, and minor works
  • ICE and Infrastructure Conditions Contract forms
  • Bespoke local authority terms and schedules of amendments
  • Framework call-off documents and access agreements

The deliverable

The review report is written to be read by a busy PM, not archived in a file. It combines a red, amber and green risk register with written commentary against each item, plus a closing walkthrough on the phone or in a meeting so nothing is misread.

What we flag

The review looks specifically at the commercial and technical clauses that most commonly cause disputes and cost overruns on public sector schemes.

  • Onerous or unclear scope of works and change mechanisms
  • Unrealistic programmes and unenforceable milestone dates
  • Balance of risk between client and contractor, especially for ground and utility conditions
  • Liquidated damages, retention and payment terms
  • Insurance requirements and bond and warranty obligations
  • Compensation event and early warning arrangements under NEC
  • Interfaces with other contracts, framework agreements and statutory approvals

What you get

Every engagement produces the same set of tangible deliverables so the client always has a clear record of what was reviewed, agreed and reported.

  • Red, amber and green risk register mapped against the contract
  • Written commentary against every amber and red item
  • Suggested amendments and negotiating positions
  • Programme and cost-risk implications of the reviewed terms
  • Walkthrough meeting with the client team

When to bring us in

The value of this service compounds the earlier you appoint. As a rule, get in touch if any of the following apply:

  • You have received a tender return or contract draft you are about to sign
  • A framework contractor has proposed bespoke amendments to a standard form
  • You are novating a contract between designer, client and contractor
  • The scheme is heading into an ECI or two-stage tender and the first stage contract is being drafted
  • A dispute or claim is emerging and you want an independent read on the contract position

Sector focus

Arete works almost exclusively with local authorities and public bodies on highways and infrastructure schemes across Cambridgeshire and the East of England. That focus means every recommendation is calibrated to the standards, procurement routes and reporting cadences public sector clients need.

Frequently asked questions

Is this the same as a legal review?

No. Arete provides a commercial, technical and programme review of construction contracts. It is designed to sit alongside legal advice, not to replace it. Where our review flags a clause that needs a solicitor's opinion, we say so.

What is the difference between NEC and JCT?

NEC contracts are structured around active project management, with tight notification and compensation event mechanisms and Options that flex the payment model. JCT contracts are more traditional in structure, better suited to lump-sum work where the design is largely fixed at contract. Both are common on public sector schemes and both need careful review.

When should I get a contract review?

Before you sign. The review adds least value once the contract is executed. On a fast-moving scheme a few days on a contract review before signature is usually the single highest-return spend in the whole procurement.

Do you review framework call-offs?

Yes. Call-off contracts under public sector frameworks often carry amendments and schedules that materially change the underlying form, and they deserve the same review as a bespoke contract.

How long does a contract review take?

For a standard NEC or JCT contract with a normal set of amendments, Arete usually delivers the report and walkthrough within one working week of receiving the documents. Complex bespoke contracts, or contracts with substantial technical schedules, may take longer.

Contract on your desk waiting to be signed?

A week of independent review is the cheapest insurance you will buy on the whole scheme. Send it over and we will tell you what to fix before you commit.